
Cost of Dirt Installation in Boise
When planning for dirt installation in Boise, ID, understanding the costs involved can help you budget effectively for your landscaping or construction project. The cost can vary based on several factors, including the type of dirt, the volume required, and the specific tasks involved.
Factors Affecting Cost
- Type of Dirt: Different types of dirt, such as topsoil, fill dirt, or garden soil, have varying costs.
- Volume Required: Larger projects needing more dirt will generally incur higher costs.
- Delivery Distance: The further the delivery location from the dirt supplier, the higher the transportation costs.
- Labor Costs: The cost of hiring professionals to spread and level the dirt.
- Site Preparation: Costs associated with clearing and preparing the site for dirt installation.
- Equipment Rental: Additional costs if heavy machinery is needed for the project.
Average Costs for Common Tasks
Task | Average Cost (Boise, ID) |
---|---|
Topsoil (per cubic yard) | $20 - $40 |
Fill Dirt (per cubic yard) | $10 - $25 |
Delivery Fee (local) | $50 - $100 |
Labor (per hour) | $50 - $75 |
Site Preparation | $500 - $1,000 |
Equipment Rental (daily) | $200 - $400 |